February 2007 Start construction

Arrival with the students, tools and machines in the village. The site had to be cleared, the layout was traced, the workshops where installed and the project presented to the director, the Maestra and the parents of the musicschool children.First steps was to construct a drainage cage out of soft drink crates, chickenwire and fleece to allow the heavy rains beeing absorbed by the gound.

Images